- Joined
- May 6, 2019
- Messages
- 13,407
- Points
- 113
Image: Intel![]()
As part of today’s Intel Accelerated event for reassuring investors that Intel is poised to return to its former glory and reclaim its product leadership crown in 2025, Gelsinger revealed a brand-new road map that confirms Intel has completely changed its node naming. Instead of the traditional 7 nm and 7+ naming schemes, those products are now called “Intel 4” and “Intel 3,” respectively, while future 5 nm and 5+ products have been renamed to “Intel 20A” and “Intel 18A,” respectively. The “A” in those names refers to angstrom, a new era of semiconductors that will leverage two breakthrough process technologies also revealed by Gelsinger today: “RibbonFET, Intel’s first new transistor architecture in more than a decade, and PowerVia, an industry-first for backside power delivery.” Intel estimates that Intel 20A will ramp in 2024...
Continue reading...